English中文简体

新闻中心

视频 - 海瑞克TBM出现在荷兰 2021-05-10

荷兰COMOL5的Rijnland Route的第一条隧道管已经由隧道掘进机(TBM)Gaia完成。自2019年8月从卡特维克(Katwijk)A4高速公路的起点开始,TBM共挖掘了2,250 m,以完成RijnlandRoute的第一条隧道。

WATCH: Herrenknecht TBM emerges in the Netherlands


The first tunnel tube for COMOL5’s Rijnland Route in the Netherlands has been completed by tunnel boring machine (TBM) Gaia.

Since launching in August 2019 from the starting point at the A4 motorway in Katwijk, the TBM has excavated a total of 2,250 m to complete the first tunnel tube of the RijnlandRoute.

In late January, Herrenknecht’s TBM Gaia arrived under water after six months of drilling in the receiving shaft.

COMOL5 has released a time lapse demonstrating how the water is pumped away as the machine slowly becomes visible.


Over the coming weeks the cutter wheel and the front sections of the machine will be disassembled and transported back to the start shaft to commence excavating the second tunnel in April.

新闻中心 赞助商 合作媒体 下载中心 常见问题 友情链接
备案号:沪ICP备10040940号 电话:86-21-54791130 传真:86-21-54791130 邮件:ITTC@CSTT.ORG, 版权所有 上海科熙文化交流有限公司 沪公网安备 31011702006209号 技术支持:攸攸网络